First step is to check if the meter is powering up properly:
- With the meter powered off, remove the fuse cover and check for continuity in the fuse. If none, replace one with the correct specifications as seen below:
6312 | Table 1 in Installation Guide |
6320 | Table 1 in Installation Guide |
GATEWAY | Table 1 in Installation Guide |
- With the power on, check the voltage of each phase of the sense voltage terminal block (ie. Neutral to A, B, and C).
- Check to confirm if the meter is using the control voltage terminal block or the control voltage jumper, based on your meter specification.
- Confirm if the meter is properly grounded.
- Check the breaker feeding power to the meter to confirm it's in working condition.